G. Golubenko, L. Sushchenko, V. Khait
Old Houses

Director Alexander Kladko
The performance has one interval.
The duration of the performance is 2 hour 30 minutes.
This is a funny, naive story that is touching in many respects about the tenants of an old building destined for demolition, who do not want to leave their Promised Heaven for that in a new district and a separate apartment not for the world. Their own home lives its own life, keeps the reminiscence of their youth and love, disappointments and expectations. It is a bastion and harbor of persons who are, in essence, vulnerable and lonely, and ready to barricade, if it is necessary. This is a light and kind fairy tale about life with a slight absurd and humor admixture is full of surprising situations and metamorphoses, though the central point there is love as usual. It tames the worldly storms and makes it possible to make real any dream.
Parameters of a stage: - depth - 8,0 m. - width - 20,0 m. - height - 5,0 m.
The list of the sound equipment
1. Mixing console
2. Power amplifiers
3. Speakers front + arier (minimum)
4. Stage monitor
5. Stage microphones
6. Effects prossor (reverberator)
7. 2 Mic In jn the stage. 1 Line In/Out (unbalanced) on stage.
8. Connecting cables
9. 2 minidisck desk
Equipment for the realization of performance:
the back light batten PAR 64 – 18 ex. (7 switch on)
Profile ETC 0.575/36 – 1 (1 switch on)
Light Gods:
– PAR 64 – 6,
– Profiles – 1pacific (8 switch on, 3- for properties floodlights).
Remote equipment – PC 1000w - 14, 14 switch on.
Cat-walk – PC 1000w - 26 (26 switch on)
The Floor: 8 operated switch on
direct switch on - 2.
Console – computer programmable - FOTON (SPARK), 120 channels.